Sling Endorsement
Sling Load Endorsement is conducted in the AS350 Squirrel and will include up to 10 hours dual training covering Vertical Reference Flying, short, medium and long line operations. Additional considerations include equipment limitations, weight and balance issues, aircraft performance and operation.
Please note:All flight training conducted under AOC No. CASA.TAAOC.0516-10
All flight training and assessment conducted pursuant to Part 141 of the Civil Aviation Safety Regulations 1998 (CASR)
Description
Sling Load Endorsement is conducted in the AS350 Squirrel and will include up to 10 hours dual training covering Vertical Reference Flying, short, medium and long line operations. Additional considerations include equipment limitations, weight and balance issues, aircraft performance and operation.